• PROJECT
    Opération urbaine du centre-bus Belliard
  • LOCATION
    Paris, 18ème
  • CLIENT
    Linkcity
  • PROJECT MANAGEMENT
    Marc Mimram Architecture et Ingénierie, JBMN Architectes, Marti- Baron Paysage, Serau, Amoes, CL Infra
  • DATES
    2019 – 2026
  • AREA
    25,000 m² including 6,000 m² of co-living, 5,000 m² of offices, 1,500 m² of sports facilities, 12,000 m² of housing and residency, 3,000 m² of photovoltaic hall, and 260 buses stored
  • COST
    74 M€
  • ENVIRONMENTAL CERTIFICATIONS
    Certification PassivHaus; Matériaux biosourcés
  • Download the project

With the electrification of the RATP bus fleet in mind, this project provides an opportunity to reclaim an area of the 18th arrondissement that was given over to industry for over a century. It entails replacing an existing urban area with a new one, combining components that might be seen as antagonistic in order to allow them to function as part of a single whole. The 25,000 sq.m. programme includes housing, offices, residential facilities and a sports centre, all laid out around a 3,000 sq.m. garden.