• PROJECT
    Leuglay Footbridge
  • LOCATION
    Sur la rivière Ource
  • CLIENT
    Ville de Leuglay
  • PROJECT MANAGEMENT
    Marc Mimram Architecture et Ingénierie
  • DATE
    1998
  • AREA
    Span of 12 meters (oak beam) Width of 2.5 meters
  • COST
    0.04 M€
  • Download the project

The Leuglay footbridge crosses the Ource to reach the forest house. A tree trunk placed above the river forms a founding, simple and natural link.

But here, around the trunk, a dialogue is established, between the tree stump and the galvanized steel corbel arranged in a gentle curve, encountering the risks of the singular trunk. The structure arises from this meeting between nature and manufacturing.